ODOT weekly construction update, Oct. 22

The Ohio Department of Transportation has announced the following construction projects for the week of Oct. 22.
Sandusky Register Staff
Oct 22, 2012

 

ASHLAND COUNTY

US Route 250
US 250, at its bridge over the Vermilion River (between TR-448 and CR-500) in Ruggles Township, is reduced to one lane of two-way traffic as part of a bridge replacement project. Traffic will be maintained at all times with a temporary traffic signal. The project is expected to be complete in early December, 2012.

US Route 250
US 250, between County Road 1575 and Township Road 653 in Montgomery Township, is reduced to one lane of traffic in each direction. Traffic will be maintained at all times in each direction with narrowed lane widths. Access to businesses will also be maintained; however, motorists should be prepared for delays throughout construction of this project. The work is expected to be complete in mid-December, 2012.

HURON COUNTY

State Route 13
SR-13, at both the north and south approaches of its intersection with US Route 224 in Greenwich Township, is closed as part of a bridge replacement and intersection improvement project. The detour route for southbound motorists is SR-13 to US Route 250, south east on US 250 to US 224, west on US 224 to State Route 61, south on SR-61 to State Route 603, south east on SR-603 to SR-13, and reverse. The road is expected to reopen in mid-November, 2012.

LORAIN COUNTY

State Route 10
SR-10, between US Route 20 and Interstate 480, is restricted to one lane of traffic in each direction as part of a micro resurfacing project. One lane of traffic will be maintained at all times in each direction. The project is expected to be complete at the end of October, 2012.

Interstate 90
I-90, at its twin bridge structures over the Black River and Ford Road, is reduced to two narrowed 11’ lane widths of traffic in each direction for bridge deck replacements. The restrictions will remain in place through November 2013.

Interstate 90 - ***UPDATE***
I-90, at its Nagel Road overpass (between State Route 83 and Crocker Road), has narrowed lane widths for work as part of the new interchange construction project. Two lanes of traffic will be maintained at all times during the daytime hours. The project is expected to be complete in September 2013.
·         On Monday, October 22, I-90 will be reduced to two lanes of traffic in each direction from 8:00 a.m. to 4:00 p.m. for bridge painting work.
·         On Tuesday, October 23, I-90 westbound will be reduced to one lane of traffic to remove concrete barrier wall from 8:00 p.m. through 6:00 a.m. Wednesday, October 24. Motorists are advised to use extra caution and expect delays during this work.
·         Nagel Road, over Interstate 90 (between Chester Road and Avon Road), is closed as part of the new interchange construction project. Detour is posted.

MEDINA COUNTY

Interstate 71 - ***UPDATE***
I-71, between the Cuyahoga County line (mile marker 228) and just south of State Route 18 (mile marker 217), will have intermittent lane closures next week to paint pavement markings. Two lanes of traffic will be maintained at all times throughout the daytime hours; however, one lane of traffic will be maintained in each direction during the night, from 7:00 p.m. to 6:00 a.m. Motorists should anticipate delays during this work. The project is expected to be complete by October 26, 2012.

Interstate 76
I-76 eastbound, from just west of State Route 94 to the Summit County line, is reduced to one lane of traffic for a reconstruction project. Motorists are advised to use caution in this area and watch for slower moving traffic as it merges in to the open (left, passing) lane. The project will be complete in September 2013.

SR-94 Ramp to I-76 East
The entrance ramp to I-76 eastbound from State Route 94 in the city of Wadsworth is closed through mid-November, 2012. There are two detours for this area:
Cars/Light Trucks – SR-94 to State Route 261, east on SR-261 to I-76 east; and
Commercial Vehicles/Heavy Trucks – SR-94 to I-76 west, I-76 west to SR-57 south, to I-76 east.

I-76 East to SR-94
The exit ramp from I-76 eastbound to State Route 94 will close Monday, October 22. The detour route is to continue east on I-76 to State Route 261, east on SR-261 to I-76, west on I-76 to SR-94. The ramp is expected to reopen on November 5.

US Route 224
US 224, at its overlap with Rivers Corners Road (between State Route 301 and US Route 42), is closed as part of a CSX railroad bridge replacement project. The detour route for westbound motorists is US 224 to US 42, south on US 42 to State Route 89, north on SR-89 to State Route 58, north on SR-58 to US 224, and reverse for eastbound motorists. The road is expected to reopen in December, 2012.

State Route 301 - ***NEW***
SR-301, north of State Route 162 in the Village of Spencer, will close on Wednesday, October 24 for emergency sewer repairs. The detour route for northbound motorists is SR-301 to SR-162, east on SR-162 to State Route 83, north on SR-83 to State Route 18, west on SR-18 to SR-301, and reverse for southbound motorists. The road is expected to reopen on October 30, 2012.

RICHLAND COUNTY

Interstate 71 (Morrow County)
I-71 southbound, from just south of the Morrow/Richland County line to State Route 95 (between mile markers 158 and 150), is reduced to two narrowed lanes of traffic for the reconstruction and widening project. Two lanes will be maintained at all times in the southbound direction. The project is expected to be complete October 2013.

Interstate 71 - ***NEW***
I-71 will be reduced to one lane of traffic in each direction at mile marker 169 (at the State Route 13 interchange) on Sunday, October 21 at 8:00 p.m. and continuing through 8 a.m. Monday, October 22.
On Monday, October 22, the State Route 13 entrance ramp to I-71 northbound will be closed at 8:00 p.m.  The right (driving) lane of I-71 northbound will also be closed during this time. The detour route for I-71 northbound motorists is SR-13 south to State Route 97, west on SR-97 to I-71 north. The ramp is expected to reopen by
8:00 a.m. Tuesday, October 23.

WAYNE COUNTY

State Route 3
SR-3, between State Route 226 and the Ashland/Holmes County line, has intermittent lane restrictions for finalization work as part of a resurfacing project. One lane of two-way traffic will be maintained at all times with flaggers. The project is expected to be complete at the end of October, 2012.

US Route 30
US 30, between South Elyria Road and Jefferson Road, is restricted to one lane of traffic in each direction as part of a smooth seal pavement project. One lane of traffic will be maintained at all times in each direction through mid-November, 2012.

For additional information road closures caused by construction, visit www.buckeyetraffic.org.